Welcome, Guest
Username Password: Remember me

http://radarr.lunettevip.com ®oakley pas cher,tija,
(1 viewing) (1) Guest
This is the optional forum header for the Suggestion Box.
  • Page:
  • 1

TOPIC: http://radarr.lunettevip.com ®oakley pas cher,tija,

http://radarr.lunettevip.com ®oakley pas cher,tija, 12 years, 4 months ago #328

  • ioepbg118
oakley.lunettevip.com ™,lunette oakley.lunette oakley pas cher.lunette oakley pas cherCompany to Design, Build and Test the Anti-Submarine Warfare (ASW) Continuous Trail Unmanned Vessel (ACTUV) Prototype
MCLEAN,oakley pas cher, Va.,oakley lunettes, Nov. 12, 2012 (CRWENewswire) -- Science Applications International Corporation (SAIC) (NYSE:SAI) announced today it was awarded a prime contract by the Defense Advanced Research Projects Agency (DARPA) for the Anti-Submarine Warfare (ASW) Continuous Trail Unmanned Vessel (ACTUV) program phases two through four to design,oakley pas cher, build and test a new prototype unmanned autonomous surface vessel. The single-award,lunette oakley, cost-plus fixed-fee (CPFF) contract has a three-year period of performance for phases two and three with a total contract value of approximately $58 million, and a $1 million eighteen-month option for phase four. Work will be performed primarily in Virginia, Florida, Pennsylvania, Maryland,lunette oakley, Mississippi, California,lunette oakley, Washington,lunette oakley, Rhode Island,lunette oakley pas cher, and Oregon.
The DARPA ACTUV program aims to develop an unmanned autonomous surface vessel with the ability to track a quiet diesel-electric submarine overtly for months over thousands of kilometers,oakley pas cher, with minimal human input. SAIC provided conceptual design services in phase one of the program,oakley pas cher, creating an innovative wave piercing trimaran solution.
Under the contract, SAIC will provide a final design and production plan for the ACTUV prototype in phase two,oakley pas cher, construction of the prototype is scheduled to be completed in phase three,oakley, and government testing in phase four. Leveraging the company's phase one concept design as the point of departure,oakley pas cher, SAIC will work with DARPA to design,lunette oakley, build, and demonstrate an experimental vessel capable of independently deploying under sparse remote supervisory control, to achieve a game-changing ASW operational capability, with the ultimate objective to facilitate rapid transition of that capability to the Navy in response to critical operational demand. Key teammates are Oregon Iron Works and Christensen Shipyards for ship design,lunette oakley, construction and propulsion; the National Aeronautics and Space Administration's Jet Propulsion Lab; and Carnegie Mellon University for autonomy.
"Drawing on SAIC's technical depth in marine hydrodynamics, ship design, sensors,oakley pas cher, and advanced autonomy,Oakley Airwave, we're confident that the SAIC team will meet or exceed DARPA's requirements for ACTUV,oakley pas cher, a revolutionary autonomous maritime vessel,oakley pas cher," said Pete Mikhalevsky,oakley, SAIC senior vice president and operations manager. "This exemplifies the kind of technical innovation that is the hallmark of SAIC solving our customers' toughest problems."
"We are very pleased that DARPA has selected SAIC to realize its vision for this revolutionary unmanned autonomous vessel that has the potential to be a game-changer in ASW and maritime operations,lunette oakley pas cher," said John Fratamico,oakley, SAIC senior vice president and business unit general manager.
About SAIC
SAIC is a FORTUNE 500 scientific,lunette oakley, engineering, and technology applications company that uses its deep domain knowledge to solve problems of vital importance to the nation and the world, in national security,oakley jawbone, energy and the environment,lunette oakley, critical infrastructure, and health. Government civil agencies and selected commercial markets. Headquartered in McLean, Va.,lunette oakley, SAIC had annual revenues of approximately $10.6 billion for its fiscal year ended January 31,lunette oakley, 2012. A number of factors could cause our actual results, performance,lunette oakley pas cher, achievements,oakley france, or industry results to be very different from the results, performance, or achievements expressed or implied by such forward-looking statements. Some of these factors include, but are not limited to, the risk factors set forth in SAIC's Annual Report on Form 10-K for the period ended January 31, 2012, and other such filings that SAIC makes with the SEC from time to time. Due to such uncertainties and risks, readers are cautioned not to place undue reliance on such forward-looking statements, which speak only as of the date hereof.
articles connexes:
oakley,oakleypascherenligne.info
xfm.chez.com/read.php?tid=1630137www.deepcraft.org/deep/archives/2457/www.letussortthat.co.uk/help/forums/topi...replies=1#post-59504
  • Page:
  • 1
Time to create page: 0.55 seconds

© 2000-2012 Newmana.com / All Rights Reserved.
สนใจกรุณาติดต่อ www.newmana.com by พัฒนาโดย www.nuwhite.in.th